Commissioning Plan — what it is and when you need it
PlannedDefines the engineering checks, setting to work and pre-qualification testing, and which of it may be leveraged into qualification.
- Who writes it
- The engineering function, with the joint carrying ownership.
- When it appears
- Build stage — Fabrication and factory testing.
- What requires it
- ASTM E2500
- ISPE Baseline Guide — clause Vol 5
- Traceability
- Traces back to URS requirement IDs. Each acceptance criterion here should name the requirement it verifies.
What it must contain
- Scope, system identification and the revision it applies to.
- The responsibilities of each contributing function, and the approvers.
- A traceability column linking every item back to the URS requirement it addresses.
- Acceptance criteria or decision rules stated before execution.
- Handling of deviations, and how they are dispositioned before approval.
Common mistakes
- Writing it after the work, so it records what happened instead of governing it.
- Acceptance criteria that are unmeasurable, or added once results are known.
- Broken traceability — requirement IDs renumbered without updating this document.
- Approvals collected from titles rather than from the functions that contributed.
Where it sits in the lifecycle
- Available
- In development
- Planned
- Connector lines show traceability back to URS requirement IDs.
Pharma4i does not generate this document yet