Factory Acceptance Test protocol — what it is and when you need it
In developmentDefines the tests run at the supplier's works before shipment, and the acceptance criteria each must meet.
- Who writes it
- The engineering function, with the supplier carrying ownership.
- When it appears
- Build stage — Fabrication and factory testing.
- What requires it
- EU GMP Annex 15 — clause 3.4
- GAMP 5 — clause Appendix D5
- Traceability
- Traces back to URS requirement IDs. Each acceptance criterion here should name the requirement it verifies.
What it must contain
- Scope, system identification and the revision it applies to.
- The responsibilities of each contributing function, and the approvers.
- A traceability column linking every item back to the URS requirement it addresses.
- Acceptance criteria or decision rules stated before execution.
- Handling of deviations, and how they are dispositioned before approval.
Common mistakes
- Writing it after the work, so it records what happened instead of governing it.
- Acceptance criteria that are unmeasurable, or added once results are known.
- Broken traceability — requirement IDs renumbered without updating this document.
- Approvals collected from titles rather than from the functions that contributed.
Where it sits in the lifecycle
- Available
- In development
- Planned
- Connector lines show traceability back to URS requirement IDs.
Pharma4i does not generate this document yet
The URS module is the only generator available today. Leave your address and you'll hear once this one exists — signups decide what we build next.
Paired document
A protocol and its report are two separate documents.
Related in Commissioning & Qualification